Co znaczy PART PERIOD BALANCING (PP-MRP):
A procedure in material requirements planning for calculating the lot-size that optimizes total setup and storage costs (optimized lot-sizing procedure).
Starting from the material shortage date, consecutive requirements quantities are collected in a lot until the total storage costs equal the fixed costs for the lot-size.