takt based scheduling co to jest
ABAP definicja takt-based scheduling (PP-FLW). Co znaczy production dates/times on the basis of the.
Znaczenie takt based scheduling definicja.

Czy przydatne?

Definicja takt-based scheduling (PP-FLW)

Co znaczy TAKT-BASED SCHEDULING (PP-FLW):

Procedure for determining the production dates/times on the basis of the takt time and the number of takts.

In contrast to lead-time scheduling via the routing, takt-based scheduling is carried out not via the routing but on the basis of the following data:

Length of the production line, defined by the number of takts. Takt time/rate. These determine how long a material remains in each takt and in which time intervals a material enters and exits the production line

SAP przykład użycia TAKT-BASED-SCHEDULING-PP-FLW pomoc. Jak działa takt-based-scheduling-pp-flw kod programu ABAP. Wykorzystanie kodu Takt-Based-Scheduling-Pp-Flw w programie funtion module SE37. Obsługa funkcji takt-based-scheduling-pp-flw w klasie.

Słownik i definicje SAPa na T.

  • Dodano:
  • Autor: